Tunnel Concrete Lifting: Before and After at The University of Manitoba!

One of the big, successful lifts accomplished for the University of Manitoba in May of 2019!

Before: Electrical & Mechanical Rooms and Walkway Tunnels

Located beneath the Elizabeth Dafoe Library in the underground walkway tunnels, there was a lot of critical mechanical and electrical services for the building.

These critical services were all present within an area of 2500 square feet, and they have had to be adjusted annually due to settlement.

Give us a call for any commercial concrete lifting, soil stabilization, deep injection, void filling, and grout compaction projects! We are certified, licensed, trusted and insured to use the world’s most advanced equipment, and superior geotechnical polyurethane concrete lifting foams that are suited for any project specifications.

During:

You can see here how many injection points were needed in order to get everything back up!

After: Back to School!

tunnel concrete lifting

Slab-Jack Kings raised, levelled and stabilized the slabs back up as much as we could without hurting the mechanical or electrical. We then stabilized the surrounding areas to prevent future settlement. The University of Manitoba was in charge of any masonry work that they found necessary post-lift.

tunnel concrete lifting

tunnel concrete lifting

Another job well-done by our lifting crew and quite a few more happier customers. The tunnels were ready for use immediately upon job completion!

Need a tunnel concrete lifting estimate? Fill out our Request an Estimate form and one of our family members would be more than happy to help get you started.