Side-by-side before and after comparison showing settlement of sidewalk to front entrance and stabilized grade after polyurethane foam injection in Amber Trails, Winnipeg.

Sidewalk to Front Entrance – Before & After Concrete Lifting in Amber Trails, Winnipeg

This concrete sidewalk leading to the front entrance had settled by up to 3.5 inches along the front yard edge and at the entrance step. Our team raised and stabilized the slab with precision polyurethane foam injection, restoring safe, level access and a proper drainage slope.

Front Entrance Sidewalk Exhibiting Up To 3.5 Inch Settlement And Uneven Slope Prior To Polyurethane Foam Injection In Amber Trails, Winnipeg.

Before

Front Entrance Sidewalk Raised And Stabilized With Polyurethane Foam Injection—Providing Safe, Level Access And Improved Drainage In Amber Trails, Winnipeg.

After

Project Details & Results

  • Lifted sidewalk slab by up to 3.5 inches using polyurethane foam injection
  • Eliminated abrupt grade changes and trip hazards at the entrance
  • Restored drainage slope to minimize icy conditions during winter
  • Permanent subgrade stabilization and immediate improvement in safety and curb appeal

Side-By-Side Before And After Comparison Showing Settlement Of Sidewalk To Front Entrance And Stabilized Grade After Polyurethane Foam Injection In Amber Trails, Winnipeg.

Related Articles

Lifting a Radiant Heated Concrete Floor: In the Shop

Lifting a Radiant Heated Concrete Floor: Shop Floor Edition. Before: The west side of this shop floor with in-floor heat pipes had water draining towards the south west wall. This was causing major issues for this farmer because they were using this area for heavy...

Tilting or Leaning Grain Bin Floor

Say Goodbye to Tilting Grain Bin Floors: Slab-Jack Kings to the Rescue! Are you a farmer struggling with a tilting or leaning grain bin floor, fertilizer bin/tank, or hopper bin? Look no further! Slab-Jack Kings is here to level your grain bin floor at a tiny fraction...

Related Before & Afters